METRO LINE 12
GEOTECHNICAL EXPLORATION OF LINE 12 OF THE METRO
IN ASSOCIATION WITH THE COMPANY GEOTEC, THE WORK OF GEOTECHNICS OF EXPLORATION OF NEW LINES OF METRO WERE CARRIED OUT, WHICH CORRESPOND TO THE FUTURE LINE 12 OF THE METRO IN MEXICO CITY. THE CONTRACT CONSISTED OF DRILLING AND SAMPLING OF 137 BOREHOLES, OF WHICH 10 BOREHOLES WERE OF STANDARD PENETRATION WITH A PERFORATION LENGTH OF 215 M, 37 MIXED TYPE BOREHOLES, WITH A TOTAL OF 1,180 M OF PERFORATION; 40 BOREHOLES OF ELECTRIC CONE, WITH A TOTAL LENGTH OF 1,295 M. ALSO THE LABORATORY TESTS WERE MADE NECESSARY FOR THE CORRECT DEFINITION OF THE CHARACTERISTICS OF THE SUBSOIL AND THE EVALUATION OF THE BEHAVIOR IN TH LONG TERM, BEFORE THE REQUESTS TO WHICH IT WILL BE SUBMITTED.
BASIC ENGINEERING FOR THE ENLARGEMENT PROJECT OF THE LINE 12 OF THE STC
FOR THE GOVERNMENT OF MEXICO CITY. IN 2013, THE PROVISION FOR THE EXTENSION OF LINE 12 OF THE METRO COLLECTIVE TRANSPORT SYSTEM WAS CARRIED OUT, CONSISTING OF THE DEVELOPMENT OF THE BASIC ENGINEERING, OPERATIVE DEFINITION AND DESCRIPTION OF THE ELECTROMECHANIC SYSTEMS TO BE USED.
SUPERVISION OF THE PROJECT AND COORDINATION OF THE SUPERVISIONS OF THE WORK OF THE LINE 12 OF THE METRO OF MEXICO CITY
FOR THE GOVERNMENT OF MEXICO CITY THROUGH THE GENERAL DIRECTORATE OF THE METRO PROJECT. THE COORDINATION OF THE SUPERVISIONS OF THE CIVIL WORKS, AS WELL AS THE MONITORING OF THE CIVIL AND ELECTROMECHANIC PROJECT OF THE INTEGRAL PROJECT FOR THE CONSTRUCTION OF LINE 12 OF THE COLLECTIVE SYSTEM METRO OF MEXICO CITY WAS CARRIED FROM 2009 TO 2012, WITH A FERROUS SYSTEM, WHICH RUNS FROM TLAHUAC TO MIXCOAC, WITH A TOTAL LENGTH OF 24 KM.
EXECUTIVE PROJECT OF THE EXTENSION OF THE LINE 12 STC METRO
TECHNICAL SUPPORT AND FOLLOW UP TO THE IMPLEMENTATION OF THE WORK OF THE RESULTING EXECUTIVE PROJECTS THAT WILL CONFORM THE OBSERVATORIO COMPLEX CONSISTING IN THE ENLARGEMENT OF LINE 9; EXTENSION OF LINE 12; RELOCATION OF THE SECTION TACUBAYA-OBSERVATORIO OF THE LINE 1, INCLUDING ITS NEW TERMINAL, CORRESPONDING TO THE SYSTEM OF COLLECTIVE TRANSPORT (METRO); ALSO, THE INTERCONNECTION OF THESE FACILITIES OF ORGANISM WITH THE SO-CALLED INTERCITY TRAIN MEXICO-TOLUCA
STUDIES AND EXECUTIVE PROJECT OF THE EXTENSION OF THE LINE 9 STC METRO
EXECUTION OF THE EXECUTIVE PROJECT FOR THE EXTENSION OF LINE 12 SECTION MIXCOAC-OBSERVATORIO OF THE STC CONSIDERING TWO SUBSTATIONS, A TERMINAL STATION WITH THREE ROUTES AND DEPOSITS FOR 12 POSITIONS. ALL THE ENLARGEMENT BASED ON UNDERGROUND TUNNEL SOLUTIONS AND OPEN SKY WITH DEPTHS OF UP TO 45 M. INCLUDES THE DISCIPLINES OF INDUCED WORKS, GEOMETRIC PROJECT, ARCHITECTURE, GEOTECHNICS, STRUCTURES, PLUMBIG AND ELECTROMECHANICS.