EXECUTIVE PROJECT OF TUNEL 54 + 490 OF THE AMOZOC-PEROTE HIGHWAY
FOR THE STATE TOLL ROAD OPERATOR SYSTEM (SEOCC, ACRONYM IN SPANISH) OF THE STATE OF PUEBLA. FROM 2001 TO 2002 WAS CARRIED OUT THE EXECUTIVE PROJECT OF A TUNNEL OF 340 M OF LONGITUDE, LOCATED IN THE LIMITS OF THE STATES OF PUEBLA AND TLAXCALA. THE TUNNEL WILL HOUSE THREE LANES OF 3.50 M EACH AND WILL HAVE A HORSESHOE-TYPE SECTION OF 12.0 M BASE AND 7.80 M HIGH AND EXCAVATED IN AN ANDESITIC RIFT
THE PROJECT INCLUDES: GEOPHYSICAL EXPLORATION, DIRECT EXPLORATORY SURVEYS, GEOLOGICAL AND GEOTECHNICAL STUDIES, CROSS SECTION DESIGN, PRIMARY AND DEFINITIVE CLADDING DESIGN THROUGH THE USE OF AN INTERACTION MODEL SOIL-STRUCTURE, CONSTRUCTION PROCEDURES OF THE TUNNEL AND ITS SEIZURES, SPECIFICATIONS OF FINANCE CONSTRUCTION, DESIGN OF THE ILLUMINATION, ELABORATION OF THE CATALOGUE OF CONCEPTS AND BUDGET.